Equipment
Specify the exact units, usable facilities, fittings and capacity for the proposed workforce and working hours.
Purchase · Hire · Delivered and installed cost
Site welfare unit hire costs depend on the facilities, hire period and services your project needs. Ask for a quote covering delivery to your postcode, installation, servicing and collection. This guide helps you compare the full budget and assess buying as an alternative.

Use this quotation checklist to request a current hire rate for the actual facilities, workforce and dates. There is no published UK rental price sample or flat delivery tariff on this page. The postcode, site access and required servicing must be included in the supplier's assessment.
Specify the exact units, usable facilities, fittings and capacity for the proposed workforce and working hours.
Include delivery, offloading, supports, assembly, water and drainage arrangements, electricity and commissioning before work starts.
Price cleaning, consumables, tank emptying and water replenishment, maintenance, emergency replacement and final collection.
Ask for the charge period, VAT, minimum hire, extension and notice terms, and every delivery or collection charge. Commercial hire terms do not change the requirement to provide suitable welfare from the start and throughout the work.
Request an itemised quotationFor construction work, these provisions come from CDM 2015 Schedule 2 in England, Wales and Scotland, and CDM 2016 Schedule 3 in Northern Ireland. Plan them before work starts and keep them available throughout the work.
Washing facilities belong beside toilets and near required changing rooms. They must include clean hot and cold, or warm, water, with running water so far as reasonably practicable, cleaning products and a way to dry. Provide showers where the work or health risks require them.
Include in the specification: Choose a basin large enough for hands, face and forearms. Specify the heater, water supply and replenishment, soap and towels or dryers. Hand sanitiser alone is not a replacement for suitable washing facilities. Keep washing separate from eating and rest areas where hazardous substances could contaminate food.
Legal provisions: paragraph 2 of GB Schedule 2 / NI Schedule 3.
Changing rooms are required where workers need special work clothing and cannot reasonably change elsewhere for health or propriety reasons. Provide seats, separate rooms or separate use by men and women where needed, and drying facilities where necessary. Provide secure storage for clothing and personal effects where needed.
Include in the specification: Allow for wet clothing and the number changing together. Keep contaminated protective clothing separate from ordinary clothes; specify lockers, seating and a safe drying arrangement.
Legal provisions: paragraph 4 of GB Schedule 2 / NI Schedule 3.
Provide accessible rest rooms or areas with enough tables and seats with backs for simultaneous users, arrangements to prepare and eat meals, and a way to boil water. Maintain an appropriate temperature. Provide for pregnant or nursing workers to rest lying down where necessary.
Include in the specification: Agree break-time occupancy, food preparation, heating and ventilation. Keep the space clean and free of stored plant, tools and materials; an office label alone does not make a cabin a suitable rest area.
Legal provisions: paragraph 5 of GB Schedule 2 / NI Schedule 3.
Use HSE's checks to plan toilets and washing and changing, drinking water and rest. For Northern Ireland, check who is responsible under HSENI's guidance.
Request a total for your project, with each line item shown as included, priced separately or covered by your team.
Purchase price or hire charges for the planned period. Ask for a list of rooms, furniture, heating and sanitary equipment.
Site address, number of trips and lifting method. For hire, ask for a price for delivery and collection.
Supports, levelling, packing, joining the units and access. Make clear what your team prepares and what the supplier does.
Water, drainage and electricity: distance to connections, materials, works and commissioning. Specify any standalone needs.
Utilities, maintenance, refilling and emptying of any tanks. Ask what is included and how often.
For hire: dismantling, collection, cleaning and reinstatement conditions. For purchase: dismantling, relocation or storage if you reuse the units.
Security deposit, any insurance, excess, extension and reinstatement: ask for the applicable terms and amounts. A refundable deposit is cash you have to put forward; it is not automatically added to the final cost.
Have the billing start and end dates, the minimum hire period and how a part month is handled confirmed. The total hire charges depend on these terms.
Hire charges for the period + delivery and collection + installation and connections + services and end-of-hire costs.
Also ask the price for an extra month. If a monthly amount relates to finance with an option to purchase, compare the commitment period, any initial payment and the final purchase price before comparing it with standard hire.
Compare the solutions over the same period of use and with the same equipment. Purchasing may also involve costs between two sites.
Ask for a hire offer with transport, collection and detailed services. Cost an extension if the end date remains uncertain.
Cost up the hireAdd to the purchase the transfers, storage, maintenance and adaptations. For used units, ask for details of condition, repairs and equipment actually supplied.
Cost up the purchaseNo period of use automatically makes purchase more cost-effective. Base the calculation on planned projects and comparable quotes, without assuming a guaranteed resale.
A lower total is useful if the proposed installation covers the same needs.
For each quote, check the quantities, plan, inclusions and exclusions. Keep amounts on the same tax basis: an ex VAT price cannot be compared directly with an inc VAT total.
Prepare an enquiry with your period, location and required equipment. Free and without obligation.
Prepare a welfare hire enquiryDescribe the workforce, uses and rooms required.
ReadSpecify the hire period, facilities, servicing and collection before comparing costs.
ReadAnticipate the siting, lifting and connections.
ReadSee the guidelines on equipment and hygiene.
ReadUK welfare guidance reviewed on 28 September 2026. Prices depend on the quoted equipment, location, duration and services; the directory does not sell or hire these units.